Mallow Castle, Co. Cork.
A new and highly anticipated children’s playground has been opened at Mallow Castle Park by Cork County Council, signaling the first phase of the redevelopment of Mallow Castle Grounds.
On this project we worked with Vision Contracting, where we supplied and installed new boundary fencing and gates which have been erected within the former walled gardens. These railings which included 2000mm high Interlaced Bow-top Railing, 2no 2000mm wide & 1no 6000mm wide gates were installed on new stone wall and stone gate pillars.
We fabricated and finished products in a Black RAL 9005 Coating over full Hot Dipped Galvanising (Plasgalv®) which will provide a long lasting maintenance free finish. Materials were manufactured at our premises in Inchicore, Dublin.
To learn more about our Railing range click here